Skip to content
This site is continuously updated. Last updated:

Part of Project Jupiter Watch — the public record of the $165B data-center deal in Doña Ana County, NM. New here? Start with the Film →

The Web / Organizations / EDF Power Solutions

Dossier · Organization

EDF Power Solutions

verification: caveated

A renewables developer that holds a recorded lease memorandum on land in the same assembly as the campus.

At a glance

Kind
Company
Jurisdiction
Private sector (no public jurisdiction)
Also known as
EDF Renewables
Verification
caveated — True with a stated limit on it
In the record
1 sources · 1 connections · 0 dated entries
Record id
PJO133

Key facts

  • 2025-10Holds a recorded lease memorandum from October 2025 on Paseo Del Norte land in the same assembly.[1]
  • A land position, not a built project.

The record

Renewables developer (EDF Renewables) holding a recorded lease memorandum (October 2025) on land in the same assembly. A land position, not a built project.

Relationships · 1

Tenant or customer of

Sources · 1

Contact us about this entry

Corrections, updates, and disputes are taken seriously and logged. If you are the subject of this page, this is your standing right of reply.

I am contacting…
Send via your mail app ↗

Opens your email client addressed to projectjupiterwatch@protonmail.com. Nothing is transmitted until you press send there. Responses from those named in the Watch are published verbatim.

The hearing has passed
The Watch stands.

The decision was due July 21. Instead: a public hearing — first set for October, then moved up to September 14 at the applicant’s request — and a ruling due by November 23. A $165B question for one desert county, on a schedule that keeps moving. The clock above always shows the next date that matters. Until the ruling, and after, this is the public watch on how it’s being made.